节能环保无锅炉电加热橡套电缆生产线,干法交联生产线_卫华电工机械_河北卫华电工机械有限公司
热门产品
  • Three layers of combined dry, dry and crosslinked cable production lines
  • How to handle the fault of plastic extruder?
  • Operation of wire cable extruder
  • Temperature control of plastic extruder
  • The extrusion machine is produced during the extrusion process
  • How to repair the local defect of electrical cable insulation sheath by three-la
  • The importance of plastic extruder screw
  • Silica gel extruder is a kind of commonly used rubber machine
  • Use of extruder heat deforming lubricant
  • The three levels of the joint cable production line of the cable line
  • The current position:HOMEPAGE > NEWS > news information >
    news information

    Three layers of combined dry and dry joint cable production line before driving

    Release time:2017-06-08 The publisher:Wei hua electrician

    Three levels of combined dry and dry joint cable production line before driving:

    (1) select the sealing pad and the matching module to be prepared by the production cable specification, lower the sealing pad and mould, and be installed in the extruder.

    (2) the heating and insulation of the extruder shall not be less than three to four hours in the first time, in order to make the temperature of the extruder meet the process requirements.

    (3) the jigsaw leadless crosslinking tube, the need to use special lead into line, lead to the closed out, and around the traction wheel, through the line reserviors idler pulley, coupling this tray.

    Wire connector (4) the required wire through the brass with hydraulic joint, also can use the welding joint, coil up reach the designated position, automatically adjustable center and tension.

    The series of gear box series and the number of gear box series and the number of gear boxes for drawing and receiving line are selected by the process requirement.

    (6) shielding materials dry shielding materials before driving to inhale dryer for drying, the temperature of 40 and 60 ℃, time of not less than 4 hours.

    (7) the line of the receiving line shall be selected in the right length of the line, and the Angle of the line pitch, the limit of the line, and the line guide of the line shall be adjusted.