Three levels of combined dry and dry joint cable production line before driving:
(1) select the sealing pad and the matching module to be prepared by the production cable specification, lower the sealing pad and mould, and be installed in the extruder.
(2) the heating and insulation of the extruder shall not be less than three to four hours in the first time, in order to make the temperature of the extruder meet the process requirements.
(3) the jigsaw leadless crosslinking tube, the need to use special lead into line, lead to the closed out, and around the traction wheel, through the line reserviors idler pulley, coupling this tray.
Wire connector (4) the required wire through the brass with hydraulic joint, also can use the welding joint, coil up reach the designated position, automatically adjustable center and tension.
The series of gear box series and the number of gear box series and the number of gear boxes for drawing and receiving line are selected by the process requirement.
(6) shielding materials dry shielding materials before driving to inhale dryer for drying, the temperature of 40 and 60 ℃, time of not less than 4 hours.
(7) the line of the receiving line shall be selected in the right length of the line, and the Angle of the line pitch, the limit of the line, and the line guide of the line shall be adjusted.