节能环保无锅炉电加热橡套电缆生产线,干法交联生产线_卫华电工机械_河北卫华电工机械有限公司
热门产品
  • The development of plastic extruder
  • Extrusion system of plastic extruder
  • The extrusion machine is produced during the extrusion process
  • Three layers of combined dry, dry and crosslinked cable production lines
  • Rubber sleeve extruder is refined and processed
  • Hebei weihua electrician machinery co., LTD. Patent products, no boilers, energy
  • The advantages and disadvantages of the steam vulcanized pipe line of the produc
  • Plastic extruder safety operation maintenance
  • The effect of extruder filter on plastic extruding
  • Energy-saving and environment-friendly, non-boiler rubber cable production line
  • The current position:HOMEPAGE > NEWS > Technical documentation >
    Technical documentation

    Basic construction of rubber tube extruder

    Release time:2017-06-08 The publisher:Wei hua electrician

    1, according to the requirement of the workshop layout and equipment use manual digging foundation pit, and in cable trench dug up, top and bottom water and compressed air conveying work groove and the auxiliary foundation pit extruder production line.

    Press the bolt hole size of the extruder to the fixed foot hole.

    To make a trapezoid or a large cone;

    Move at the same time, dug out in the auxiliary tank track, tractor anchor hole and the basis of the cutting machine on the basis of the anchor hole, anchor hole, the equipment foundation shall prevail, with the center line of the extruder the anchor hole correction in the center of a line.

    Install the pipe line, the pipe in and out, and the air pipe.

    Use the concrete of 300 or 400 cement to water the foundation, and leave the equipment to the ground.

    Should be watered twice a day after 24 h of preserve one's health, environmental temperature will stay above 5 ℃, and based on concrete cover a layer of straw bag, cement based regimens to achieve 7 to 14 days.

    After 5, basic solid foundation, can be carried out on the basis of compression test, pressure load is 1.5 times the weight of the equipment, usually time for 3 to 5 days, if not sinking, equipment installation can be achieved.