1, according to the requirement of the workshop layout and equipment use manual digging foundation pit, and in cable trench dug up, top and bottom water and compressed air conveying work groove and the auxiliary foundation pit extruder production line.
Press the bolt hole size of the extruder to the fixed foot hole.
To make a trapezoid or a large cone;
Move at the same time, dug out in the auxiliary tank track, tractor anchor hole and the basis of the cutting machine on the basis of the anchor hole, anchor hole, the equipment foundation shall prevail, with the center line of the extruder the anchor hole correction in the center of a line.
Install the pipe line, the pipe in and out, and the air pipe.
Use the concrete of 300 or 400 cement to water the foundation, and leave the equipment to the ground.
Should be watered twice a day after 24 h of preserve one's health, environmental temperature will stay above 5 ℃, and based on concrete cover a layer of straw bag, cement based regimens to achieve 7 to 14 days.
After 5, basic solid foundation, can be carried out on the basis of compression test, pressure load is 1.5 times the weight of the equipment, usually time for 3 to 5 days, if not sinking, equipment installation can be achieved.